Project Procurement - K-Electric

Project Procurement

Click here to view Terms & Conditions for Material. Click here to view Terms & Conditions for Services.

KE is taking strides to achieve a 30% share of renewable energy in its generation mix by 2030.Our vision is to enable access to affordable energy for a growing customer base.

See what our CEO has to say about this exciting milestone


Request for Proposal/Qualification for Renewable Projects

Click on project for complete list of documents

RFP for 50 MW Solar Project at Winder and 100 MW Solar at Bela, Balochistan – Extended Deadline : 31-07-2024 Download

Corrigendum 1 Corrigendum 2
Corrigendum 3
Additional Information
Amendment Note for EPA
Corrigendum 4
Corrigendum 5
Corrigendum 6
General Clarification
EPA Documents – WBB
Site Sub Lease Agreement Bela
Site Sub Lease Agreement Winder
1.0Request for Proposal for 50 MW Solar Project at Winder and 100 MW Solar Project at Bela, Balochistan
1.10Exhibit 11 of RFP – Energy Purchase Agreement
1.20Exhibit 12 of RFP – Feasibility Study Report (Part A-Winder)
1.21Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 (Meteonorm)
1.22Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 (SolarGIS)
1.23Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 bifacial (Meteonorm)
1.24Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 bifacial (SolarGIS)
1.25Appendix 2 (Winder) – Geotechnical Investigation Report
1.26Appendix 3 (Winder) – Meteorological Report
1.27Appendix 4 (Winder) – Initial Environmental Examination
1.30Exhibit 12 of RFP – Feasibility Study Report (Part B-Bela 1)
1.31Appendix 1 (Bela 1) – PVSyst Simulation Pnom 1.2 (SolarGIS)
1.32Appendix 1 (Bela 1) – PVSyst Simulation Pnom 1.2 Bifacial (SolarGIS)
1.33Appendix 1 (Bela 1) – PVSyst Simulation ratio1.2 (Meteonorm)
1.34Appendix 1 (Bela 1) – PVSyst Simulation ratio1.2 Bifacial (Meteonorm)
1.35Appendix 2 (Bela 1) – Geotechnical Investigation Report
1.36Appendix 3 (Bela 1) – Meteorological Report
1.37Appendix 4 (Bela 1) – Initial Environmental Examination
1.40Exhibit 12 of RFP – Feasibility Study Report (Part C-Bela 2)
1.41Appendix 1 (Bela 2) – PVSyst Simulation Bifacial (Meteonorm)
1.42Appendix 1 (Bela 2) – PVSyst Simulation Bifacial (SolarGIS)
1.43Appendix 1 (Bela 2) – PVSyst Simulation Monofacial (Meteonorm)
1.44Appendix 1 (Bela 2) – PVSyst Simulation Monofacial (SolarGIS)
1.45Appendix 2 (Bela 2) – Geotechnical Investigation Report
1.46Bela 2 – Cut & Fill
1.47Bela 2 – Terrain Model
1.50Exhibit 15 of RFP – Prequalification Document
1.60Exhibit 16 of RFP – Waste Management Procedure
1.70Exhibit 17 of RFP – Hazard Substance Management Procedure
1.80Exhibit 18 of RFP – Safety Signs and Barricade Guidelines
1.90Exhibit 19 of RFP – NOC from Balochistan Environmental Protection Agency (Part A – Winder)
1.91Exhibit 19 of RFP – NOC from Balochistan Environmental Protection Agency (Part B – Bela)
RFP for 220 MW Site Neutral Hybrid Project at Dhabeji Extended Deadline : 31-08-2024 Download

Corrigendum 1
Corrigendum 2
Corrigendum 3
KE Brief on the Proposed Escrow Arrangement
Amendment Note for EPA
Corrigendum 4
Corrigendum 5
Corrigendum 6
Schedule 10
Schedule 13
General Clarification I
General Clarification II
Corrigendum 7
EPA Amendment Note-2
Updated EPA
2.0Request for Proposal for 220 MW Site Neutral Hybrid Project at Dhabeji
2.1Exhibit 14 of RFP – Hazard Substance Management Procedure
2.2Exhibit 15 of RFP – Waste Management Procedure
2.3Exhibit 16 of RFP – Prequalification Document
2.4Exhibit 17 of RFP – Energy Purchase Agreement
2.5Exhibit 18 of RFP – Safety Signs and Barricade Guidelines
RFP for 120 MW – SSEP – Deh Halkani
Deadline : 30-09-2024
Only applicable for prequalified applicants
Download

PreQualified Applicant List
Corrigendum #1
EPA Document – SSEP Deh Halkani
Extension Notification
Feasibility Study
Corrigendum-02
Land Leveling Response
General Clarification

4.0Request for Proposal for 120 MW Utility Scale Solar Power Plant at Deh – Halkani, District West, Karachi, Sindh, Pakistan
4.10Exhibit 15 of RFP – Energy Purchase Agreement
4.11Schedule 10 – NPMV Measurement Protocol
4.12Schedule 13 – Hybrid Forecast Model Testing Protocol
4.13KE Brief on the Proposed Escrow Arrangement
4.20Exhibit 17 of RFP – Feasibility Study
4.21Annexure I- Transportation and Access Study Report
4.22Annexure II- Topographic Survey Map
4.23Annexure III- Solar Resource and Energy Yield Assessment (SRA)
4.24Annexure IV – Geotechnical Investigation and Earth Resistivity Study
4.25Annexure V – Flood Risk Assessment Study
4.26Annexure VI – Initial Environmental Examination (IEE)
4.27Annexure VII – Grid Interconnection Study (GIS)
4.28Annexure VIII- Equipment Datasheets
4.30Exhibit 18 of RFP – Hazard Substance Management Procedure
4.40Exhibit 19 of RFP – Waste Management Procedure
4.50Exhibit 20 of RFP – Safety Signs and Barricade Guidelines
4.60Exhibit 21 of RFP – NOC from Sindh Environmental Protection Agency (SEPA)
4.70Exhibit 22 of RFP – Site Sub-Lease Agreement (Draft to be approved by GoS)
RFP for 150 MW – SSEP – Deh Metha Ghar
Deadline : 30-09-2024
Only applicable for prequalified applicants
Download

PreQualified Applicant List
Corrigendum #1
EPA Document – SSEP Deh Metha Ghar
Extension Notification
Feasibility Study
Corrigendum-02
Land Leveling Response
General Clarification

5.0Request for Proposal for 150 MW Utility Scale Solar Power Plant at Deh – Metha Ghar, District Malir, Karachi, Sindh, Pakistan
5.10Exhibit 15 of RFP – Energy Purchase Agreement
5.11Schedule 10 – NPMV Measurement Protocol
5.12Schedule 13 – Hybrid Forecast Model Testing Protocol
5.13KE Brief on the Proposed Escrow Arrangement
5.20Exhibit 17 of RFP – Feasibility Study
5.21Annexure I- Transportation and Access Study Report
5.22Annexure II- Topographic Survey Map
5.23Annexure III- Solar Resource and Energy Yield Assessment (SRA)
5.24Annexure IV – Geotechnical Investigation and Earth Resistivity Study
5.25Annexure V – Flood Risk Assessment Study
5.26Annexure VI – Initial Environmental Examination (IEE)
5.27Annexure VII – Grid Interconnection Study (GIS)
5.28Annexure VIII- Equipment Datasheets
5.30Exhibit 18 of RFP – Hazard Substance Management Procedure
5.40Exhibit 19 of RFP – Waste Management Procedure
5.50Exhibit 20 of RFP – Safety Signs and Barricade Guidelines
5.60Exhibit 21 of RFP – NOC from Sindh Environmental Protection Agency (SEPA)
5.70Exhibit 22 of RFP – Site Sub-Lease Agreement (Draft to be approved by GoS)

Tender No.Tender DescriptionExpiry Date
1 Corrigendum #01
Corrigendum #02
KE Site Neutral Hybrid Renewable Project (200MW)17.03.2023 (no further extension will be given)

Tender No.Tender DescriptionExpiry Date
1 KE/PID/01/24132/11kV Askari-VI GIS Grid Station and Extensions in 132kV KDA and Memongoth Grid Stations
Corrigendum #1
Corrigendum #2
Presentation Slide Pack
Corrigendum #3
Corrigendum #4
Corrigendum #5
Corrigendum #6
Corrigendum #7
Corrigendum #8
22.03.2024
2 KE/PID/02/24132kV S/C Transmission Line from KDA Grid Station to Memon Goth Grid Station
Corrigendum #1
Corrigendum #2
Presentation Slide Pack
Corrigendum #3
Corrigendum #4
Corrigendum #5
Corrigendum #6
Corrigendum #7
Corrigendum #8
Corrigendum #9
07.03.2024
3 KE/PID/03/24SCADA system works at LDC and DRC

22.02.2024
4 KE/PID/05/24SCADA Integration Works at LDC & DRC for 132kV New Grid Stations of Vinder, Uthal, Bela and Extension of Hub Chowki Grid Station.

30.05.2024
4 KE/PID/06/2402 Nos. outdoor AIS metering bays with complete arrangement and connection with existing 02 Nos. GIS Bays at 132kV Baldia Grid Station for 132kV
Corrigendum #1
Corrigendum #2

25.10.2024

Tender No.Tender DescriptionExpiry Date
1KE/FFS/01/24Survey, Design, Engineering, Supply, Construction, Training, Installation, Erection, Testing, Commissioning, Energization and Handing over of Water Sprinkler & Hydrant System on Turnkey basis

16.12.2024
2 KE/PID/04/24 HVUB Project (“Construction of new 132/11kV Outdoor Type AIS Grid Stations at Vinder, Uthal, Bela and Extension in 132kV Hub-Chowki Grid Station”)

Corrigendum #2
Corrigendum #3
Corrigendum #4
Corrigendum #5
Corrigendum #6
Corrigendum #7
Corrigendum #8

03.07.2024

Tender No.Tender DescriptionExpiry Date
1LPO/PP/008/2021Procurement of 48VDC Battery Bank14.02.2022
2KE-TRANS-10-23132 kV Defence-Korangi West EHT Cable Replacement Project of Existing 132 kV 800 sq mm OFC Circuit with 132 kV 800 sq mm XLPE Circuit17.11.2023 11:30 AM

Civil Works

Tender No.Tender DescriptionExpiry Date

1

W-3943

Rate running contract for Civil Works15-02-2024

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

Services

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

Tender No.Tender DescriptionAdvertisement DateExpiry Date
1KE–DPD / PD/ NR / 001Network Rehabilitation, PMT Maintenance, LBS Installation & VCB Installation in the KE distribution

Corrigendum

04.02.202428.02.2024

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

WordPress Lightbox