Project Procurement

Click here to view Terms & Conditions for Material. Click here to view Terms & Conditions for Services.

KE is taking strides to achieve a 30% share of renewable energy in its generation mix by 2030.Our vision is to enable access to affordable energy for a growing customer base.

See what our CEO has to say about this exciting milestone


Request for Proposal/Qualification for Renewable Projects

Click on project for complete list of documents

RFP for 50 MW Solar Project at Winder and 100 MW Solar at Bela, Balochistan – Extended Deadline : 31-07-2024 Download

Corrigendum 1 Corrigendum 2
Corrigendum 3
Additional Information
Amendment Note for EPA
Corrigendum 4
Corrigendum 5
Corrigendum 6
General Clarification
1.0Request for Proposal for 50 MW Solar Project at Winder and 100 MW Solar Project at Bela, Balochistan
1.10Exhibit 11 of RFP – Energy Purchase Agreement
1.20Exhibit 12 of RFP – Feasibility Study Report (Part A-Winder)
1.21Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 (Meteonorm)
1.22Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 (SolarGIS)
1.23Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 bifacial (Meteonorm)
1.24Appendix 1 (Winder) – PVSyst Simulation Pnom 1.2 bifacial (SolarGIS)
1.25Appendix 2 (Winder) – Geotechnical Investigation Report
1.26Appendix 3 (Winder) – Meteorological Report
1.27Appendix 4 (Winder) – Initial Environmental Examination
1.30Exhibit 12 of RFP – Feasibility Study Report (Part B-Bela 1)
1.31Appendix 1 (Bela 1) – PVSyst Simulation Pnom 1.2 (SolarGIS)
1.32Appendix 1 (Bela 1) – PVSyst Simulation Pnom 1.2 Bifacial (SolarGIS)
1.33Appendix 1 (Bela 1) – PVSyst Simulation ratio1.2 (Meteonorm)
1.34Appendix 1 (Bela 1) – PVSyst Simulation ratio1.2 Bifacial (Meteonorm)
1.35Appendix 2 (Bela 1) – Geotechnical Investigation Report
1.36Appendix 3 (Bela 1) – Meteorological Report
1.37Appendix 4 (Bela 1) – Initial Environmental Examination
1.40Exhibit 12 of RFP – Feasibility Study Report (Part C-Bela 2)
1.41Appendix 1 (Bela 2) – PVSyst Simulation Bifacial (Meteonorm)
1.42Appendix 1 (Bela 2) – PVSyst Simulation Bifacial (SolarGIS)
1.43Appendix 1 (Bela 2) – PVSyst Simulation Monofacial (Meteonorm)
1.44Appendix 1 (Bela 2) – PVSyst Simulation Monofacial (SolarGIS)
1.45Appendix 2 (Bela 2) – Geotechnical Investigation Report
1.46Bela 2 – Cut & Fill
1.47Bela 2 – Terrain Model
1.50Exhibit 15 of RFP – Prequalification Document
1.60Exhibit 16 of RFP – Waste Management Procedure
1.70Exhibit 17 of RFP – Hazard Substance Management Procedure
1.80Exhibit 18 of RFP – Safety Signs and Barricade Guidelines
1.90Exhibit 19 of RFP – NOC from Balochistan Environmental Protection Agency (Part A – Winder)
1.91Exhibit 19 of RFP – NOC from Balochistan Environmental Protection Agency (Part B – Bela)
RFP for 220 MW Site Neutral Hybrid Project at Dhabeji Extended Deadline : 31-08-2024 Download

Corrigendum 1
Corrigendum 2
Corrigendum 3
KE Brief on the Proposed Escrow Arrangement
Amendment Note for EPA
Corrigendum 4
Corrigendum 5
Corrigendum 6
Schedule 10
Schedule 13
2.0Request for Proposal for 220 MW Site Neutral Hybrid Project at Dhabeji
2.1Exhibit 14 of RFP – Hazard Substance Management Procedure
2.2Exhibit 15 of RFP – Waste Management Procedure
2.3Exhibit 16 of RFP – Prequalification Document
2.4Exhibit 17 of RFP – Energy Purchase Agreement
2.5Exhibit 18 of RFP – Safety Signs and Barricade Guidelines
RFP for 120 MW – SSEP – Deh Halkani
Deadline : 15-08-2024
Only applicable for prequalified applicants
Download

PreQualified Applicant List
Corrigendum #1

4.0Request for Proposal for 120 MW Utility Scale Solar Power Plant at Deh – Halkani, District West, Karachi, Sindh, Pakistan
4.10Exhibit 15 of RFP – Energy Purchase Agreement
4.11Schedule 10 – NPMV Measurement Protocol
4.12Schedule 13 – Hybrid Forecast Model Testing Protocol
4.13KE Brief on the Proposed Escrow Arrangement
4.20Exhibit 17 of RFP – Feasibility Study
4.21Annexure I- Transportation and Access Study Report
4.22Annexure II- Topographic Survey Map
4.23Annexure III- Solar Resource and Energy Yield Assessment (SRA)
4.24Annexure IV – Geotechnical Investigation and Earth Resistivity Study
4.25Annexure V – Flood Risk Assessment Study
4.26Annexure VI – Initial Environmental Examination (IEE)
4.27Annexure VII – Grid Interconnection Study (GIS)
4.28Annexure VIII- Equipment Datasheets
4.30Exhibit 18 of RFP – Hazard Substance Management Procedure
4.40Exhibit 19 of RFP – Waste Management Procedure
4.50Exhibit 20 of RFP – Safety Signs and Barricade Guidelines
4.60Exhibit 21 of RFP – NOC from Sindh Environmental Protection Agency (SEPA)
4.70Exhibit 22 of RFP – Site Sub-Lease Agreement (Draft to be approved by GoS)
RFP for 150 MW – SSEP – Deh Metha Ghar
Deadline : 15-08-2024
Only applicable for prequalified applicants
Download

PreQualified Applicant List
Corrigendum #1

5.0Request for Proposal for 150 MW Utility Scale Solar Power Plant at Deh – Metha Ghar, District Malir, Karachi, Sindh, Pakistan
5.10Exhibit 15 of RFP – Energy Purchase Agreement
5.11Schedule 10 – NPMV Measurement Protocol
5.12Schedule 13 – Hybrid Forecast Model Testing Protocol
5.13KE Brief on the Proposed Escrow Arrangement
5.20Exhibit 17 of RFP – Feasibility Study
5.21Annexure I- Transportation and Access Study Report
5.22Annexure II- Topographic Survey Map
5.23Annexure III- Solar Resource and Energy Yield Assessment (SRA)
5.24Annexure IV – Geotechnical Investigation and Earth Resistivity Study
5.25Annexure V – Flood Risk Assessment Study
5.26Annexure VI – Initial Environmental Examination (IEE)
5.27Annexure VII – Grid Interconnection Study (GIS)
5.28Annexure VIII- Equipment Datasheets
5.30Exhibit 18 of RFP – Hazard Substance Management Procedure
5.40Exhibit 19 of RFP – Waste Management Procedure
5.50Exhibit 20 of RFP – Safety Signs and Barricade Guidelines
5.60Exhibit 21 of RFP – NOC from Sindh Environmental Protection Agency (SEPA)
5.70Exhibit 22 of RFP – Site Sub-Lease Agreement (Draft to be approved by GoS)

Tender No.Tender DescriptionExpiry Date
1 Corrigendum #01
Corrigendum #02
KE Site Neutral Hybrid Renewable Project (200MW)17.03.2023 (no further extension will be given)

Tender No.Tender DescriptionExpiry Date
1 KE/PID/01/24132/11kV Askari-VI GIS Grid Station and Extensions in 132kV KDA and Memongoth Grid Stations
Corrigendum #1
Corrigendum #2
Presentation Slide Pack
Corrigendum #3
Corrigendum #4
Corrigendum #5
Corrigendum #6
Corrigendum #7
Corrigendum #8
22.03.2024
2 KE/PID/02/24132kV S/C Transmission Line from KDA Grid Station to Memon Goth Grid Station
Corrigendum #1
Corrigendum #2
Presentation Slide Pack
Corrigendum #3
Corrigendum #4
Corrigendum #5
Corrigendum #6
Corrigendum #7
Corrigendum #8
Corrigendum #9
07.03.2024
3 KE/PID/03/24SCADA system works at LDC and DRC

22.02.2024
4 KE/PID/05/24SCADA Integration Works at LDC & DRC for 132kV New Grid Stations of Vinder, Uthal, Bela and Extension of Hub Chowki Grid Station.

30.05.2024

Tender No.Tender DescriptionExpiry Date
1 KE/PID/04/24 HVUB Project (“Construction of new 132/11kV Outdoor Type AIS Grid Stations at Vinder, Uthal, Bela and Extension in 132kV Hub-Chowki Grid Station”)

Corrigendum #2
Corrigendum #3
Corrigendum #4
Corrigendum #5
Corrigendum #6
Corrigendum #7
Corrigendum #8

03.07.2024

Tender No.Tender DescriptionExpiry Date
1LPO/PP/008/2021Procurement of 48VDC Battery Bank14.02.2022
2KE-TRANS-10-23132 kV Defence-Korangi West EHT Cable Replacement Project of Existing 132 kV 800 sq mm OFC Circuit with 132 kV 800 sq mm XLPE Circuit17.11.2023 11:30 AM

Civil Works

Tender No.Tender DescriptionExpiry Date

1

W-3943

Rate running contract for Civil Works15-02-2024

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

Services

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

Tender No.Tender DescriptionAdvertisement DateExpiry Date
1KE–DPD / PD/ NR / 001Network Rehabilitation, PMT Maintenance, LBS Installation & VCB Installation in the KE distribution

Corrigendum

04.02.202428.02.2024

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

Tender No.Tender DescriptionExpiry Date
1Currently no tender available

WordPress Lightbox