Reactive Power Management and Loss Reduction Projects

Volt-Amps Reactive (VAR) is the measuring unit for reactive power which is created by energising transformers and powering motors, pumps, and other similar electrical devices. The installation of additional capacitor banks at existing grid stations alongside capacitors at new grids is being planned, in order to have compensation for VAR requirement of network/load centers which […]
System Improvement & Reliability of KE’s Transmission Segment

These projects are required to upkeep and reinforce the existing network for ensuring reliability and stability of the power system. Further, new SMART technologies have also been opted for improving efficiency and operational excellence along with the projects required for adhering the technical limits, as per Grid Code, which includes network augmentation for maintaining N-1 […]
Interconnection Capacity Enhancement

Investment is planned for construction of new interconnection grids and Transmission lines of KE network with National Grid for wheeling of power from upcoming new power projects in Thar. Also, KE in its endeavor to produce clean and sustainable energy, has planned step-up grids and related transmission lines at Gharo corridor and another through Surjani […]
Transmission Growth Projects:

Aligned with KE’s undeterred aim to serve the metropolis, KE for its next control period, has planned its investment in transmission based on forecasted demand considering optimum utilization of resources and least cost for consumers, while ensuring stability / reliability of transmission network. KE plans to add one 500kV, three 220kV and Nine 132kV grid […]