SGTPS II and KGTPS II

The Site Gas Turbine Power Station II (SGTPS) and Korangi Gas Engine Power Station II (KTGTPS) are natural gas fired combined cycle gas engines power plants comprising of thirty two INNIO Jenbacher JGS 620 E-Series gas engines at each location having nominal rating of 3 MW1; along with NG Allen Steam Turbine MC-800 of 10MW1 capacity […]
Korangi Combined Cycle Power Plant (KCCPP)

Korangi Combined Cycle Power Plant (KCCPP) is a combined cycle power plant, consisting of four gas turbines each, having a capacity of 481 MW with Make of General Electric LM 6000 aeroderivative machines, two HRSGs and two Steam Turbines of capacity 271 MW and 281 MW respectively with make of General Electric-Thermodyn Condensing machines. Plant configuration comprises of […]
Bin Qasim Power Station III (BQPS III)

KE’s flagship project, RLNG-fired power project BQPS III has been completed with an investment worth USD 650 million thus cumulatively adding 900 MW of energy, which will help KE to cater to Karachi’s growing demand owing to the rapidly increasing energy needs. During FY 2022, KE initiated the synchronisation of the first unit of combined […]
Bin Qasim Power Station II (BQPS II)

K-Electric’s flagship 560 MW, Bin Qasim Power Station-II (BQPS-II) is recognised as one of the industry leaders in energy management best practices and holds the unique distinction of being Pakistan’s first and only ISO 50001 certified power plant for its Energy Management System which improves energy productivity and cuts CO2 emissions. It is also the […]
Bin Qasim Power Station I (BQPS I)

BQPS-I is KE’s oldest power plant, commissioned during the period 1983 – 1997. A major investment under the Generation Long Term Improvement Plan was put in effect for BQPS-I units to achieve potential and sustainable benefits in the plant’s efficiency, reliability, availability, and capacity. This plan envisaged overhauling of turbo generators, upgradations of control system […]